Green Link Estate
A 80-hectare industrial estate just 30min from the CBD, The site will be developed into a premium-grade logistics hub. Ideally situated to service the growing, affluent population of South East Melbourne, and to take advantage of the strong demand from us
Overview
Green Link Estate, acquired by ESR Australia July 2020, The site will be developed into a premium-grade logistics hub with an expected end value of circa A$450 million. The site is ideally situated to service the growing, affluent population of South East Melbourne, and to take advantage of the strong demand from users across the south-east.
Scope
Rokon have been awarded the bulk earthworks package for the 79ha site.
Key project deliverables included:
Stage 1 & 1A Highlights:
- Cut & Fill: 7000m3 & 1000m3
- Sewer: 790m x 150mm & 225mm
- Water: 724m x 150mm & 280mm
- Council Drainage: 920m x 300mm – 1350mm (1.5m – 4m Depth)
- MW Drain: 362m x 1650mm & 2100mm (1.5m – 4m Depth)
- MW Road Crossing: 62m x 3 x 1200mm & 1 x 900mm (3m Depth)
- Electrical/NBN Trenching: 860m
- Kerb & Channel: 2600m
- Footpaths, Driveways, & Carparks: 5800m2
- Pavements: 8400tn FCR
- Asphalt: 2580tn
Stage 2 & 2A – Upcoming Works:
- Cut & Fill: 4000m3 & 1000m3
- Retic Sewer: 825m x 225mm
- Branch Sewer: 570m x 525mm GRP
- Water: 690m x 150mm & 225mm
- Trility Water Main: 500m x 600mm MSCL Pipeline
- Council Drainage: 1080m x 300mm – 1350mm (1.5m – 4m Depth)
- MW Drain: 728m x 1650mm & 2100mm (1.5m – 4m Depth)
- Electrical/NBN Trenching: 1400m
- Kerb & Channel: 3800m
- Footpaths, Driveways, & Carparks: 9900m2
- Pavements: 5300tn of FCR
- Asphalt: 500tn